Lights, Plumbers, and Appliances

Chris and I made a somewhat huge decision about the kitchen and living room: we’ve decided to spring for recessed lighting. It’s a little intimidating (so permanent! so not cheap!) but if we’re ever going to do it this is the time. We definitely won’t ever want to do it AFTER the drywall guy patches everything up. I think it will go a long way in making  our mid-range kitchen remodel feel more high end.

Today the electrician came by (for the 3rd time) to install recessed lighting in the kitchen/living room and also two pendant lamps over the kitchen island. The original plan was to get these lamps from Pottery Barn:

img63o

 

They’re a little pricey BUT we have a Pottery Barn gift card left over from when West Elm totally messed up our couch delivery. Plus originally I had my heart set on these cool globe lights, until I found out they are $800 each. That totally softened the blow of the Pottery Barn lamp prices.

I am slowly getting better at modeling things
For some reason the lights don’t look centered over the island but I swear they are.

Unfortunately, despite being “in stock” on the Pottery Barn website the pendant lights are actually backordered until July. Aww hell naw. So instead I went to Lowes and got the cheapest lights that I didn’t hate, figuring we can replace them with fancy ones down the road (but probably never will).

loweslight
$35 each from Lowes. Done.

My dad and husband went on an odyssey for the recessed light fixtures. The electrician brought some, but due to a miscommunication between me, the office, and the electrician they were the wrong size. So dad and Chris went out to the electrical supply store to get the right one while the electrician started the wiring and I marked out where everything was going. But the store didn’t have enough fixtures, so then they had to go to a 2nd store to get the rest. And we’re still missing one of the trim rings, but I can order that online and install it myself later.

The fridge, stove, and grill were all delivered today as well. Miraculously they managed to fit them in without removing the storm door. Then a plumber came to give quotes for rerouting the pipes for the sink / dishwasher / ice maker. Next stop is the permit office to get permits for the plumbing. Always fun!

 

1970s Shore Home

Things Crawl Along

Progress on the house continues, but slowly.

Appliances are getting delivered next week, cabinets two weeks after that, things are starting to shape up, so I called the gas company to find out when our gas service would be installed…

“Early June.”

I was warned that the gas company a) takes forever and b) just generally sucks. But ugh. Early June. I have to decide if we want to finish the floor and then put the old-but-still-functional water heater back, or just go without hot water until early june.

Not a lot changes visibly from week to week. One fix however was the contractors fixed up the gaping hole in the rotted laundry room subfloor.

2015-04-16 12.06.23
Now with less rot!

You can actually see some significant discoloration of the new wood where it is ever so slightly damp. I’m pretty sure this is because the crawlspace is so wet all the time. We’re having an additional vent added to the foundation right along the back wall here, which should help a lot. If not we’ll add a powered crawlspace fan to keep the air circulating.

Speaking of plywood, my dad and I went to the lumber yard to get some plywood to lay over the subfloor (for leveling). Unfortunately we forgot to tie it down (oops) and a sheet of it took off like a sail and went flying down the road. It was terrifying and I’m glad no one was hurt. Traffic was pretty light so we waited for a break and then ran out to pick it up. We threw it back in the trailer and then headed to the house.

Once at the house my dad volunteered to go get a replacement sheet (as the one that escaped had been run over dozens of times), and I decided we’d actually gotten the wrong type of plywood so I sent it all back with him to exchange for some 1/2″ OSB. It would have been better if I’d decided this BEFORE we unloaded the trailer, but c’est la vie… RIGHT DAD? Clearly my dad loves me very much to put up with these shenanigans.

A drywaller came out and gave us an estimate for fixing the kitchen drywall, painting it, and also painting the hallways as I have no interest in trying to paint on a ladder on a staircase. It came out to a little more than I want to pay, because I’m cheap, but I’m going to pay it anyway because look at this hot mess:

In case you can't tell, the backsplash left a mess of glue and the drywall stops 6" from the ceiling.
In case you can’t tell, the old back splash left a mess of glue and the drywall stops 6″ from the ceiling. On and there’s a hole in the ceiling the electrician had to cut for access.

I’d originally planned to prime the bedrooms today but I just wasn’t in the mood so instead I took up the incredibly tedious task of removing ALL of the remaining staples from the floor in the laundry room. The ones that wouldn’t come up were hammered down. That floor will be smooth, damn it.

I also painted sample spots on the walls upstairs to make sure I REALLY like the color before we buy gallons and gallons of it.

I’m pretty happy with it, or at least as happy as I’m likely to ever be. I think it might be a little too dark, but any lighter and I don’t think it would have such a nice contrast with the white trim. Of course now that I’m looking at the photos I kind of hate it, but it looked good in person I swear!

Plus the slightly-dark gray will look awesome against this all white bedding monstrosity I’m planning:

Guest Cubbies!
Guest Cubbies!

The plan is to take two full-size Ikea Brimnes beds and build a partition between them so that folks can have a little privacy. Then my coworker showed me the bunk beds her mom built, complete with powered wall cubbies:

 

https://instagram.com/p/1f2xKqoRs3/

I’m not sure if this is something I can make happen but oh my god do I want to.

1970s Shore Home, DIY and Decor

When not to DIY

Everything with the house is two steps forward one step back.

We took out the hot water heater and I went to replace the rotten subfloor below it. In theory this is a fairly straightforward process. Remove the old plywood, cut new plywood to fit, put new plywood in place. In practice nothing ever goes as planned and I don’t know why I was even a little surprised that the joist under the subfloor was rotted.

2015-04-11 14.27.31
Insulation can be seen below the rotten joist and torn up floor

This is the point where I called up the contractor who had just finished the crawlspace repairs half an hour earlier and asked if they could add this project to my tab. The flooring situation in the laundry room is quickly spiraling out of the realm of things I can sanely attempt to DIY. There’s also the time factor. If I were to try to do this myself it would be another week before I can get down there to even start, and it probably would take me multiple weekends, delaying the kitchen installation even further. In contrast, the contractor said he can have everything done Monday.

I also had another contractor flounce on me. The guy who was supposed to do the vents did not like that the crawlspace guys took out the existing vents, and refuses to do the work now. He was really dramatic and shitty about it, so if that’s how he’s gonna be I’m just as glad to be rid of him.

The other thing I decided not to DIY is the drywall repairs in the kitchen. When we took the soffit out we discovered there isn’t drywall all the way up to the ceiling (surprise!). Drywall is something I can technically do myself but I’m not very good at it and I don’t have the tools to deal with the large sheets we’d need to haul up near the ceiling.

This part of rennovation is just really frustrating because there’s not a lot of visible change and the to-do list is getting longer, not shorter.

The original plan for this weekend:

  • Remove soffit in kitchen – success! Chris and his dad got that thing down. We only had one unpleasant surprise lurking behind it, a hot water line that sneaks through the corner on its way upstairs. Since that’s over the fridge anyway I’m just going to build a frame around the fridge that lets the cabinet sit a foot out from the wall. Something like this.
  • Remove hot water heater – success!
  • Spackle and sand walls in master bedroom – A qualified success. This did in fact happen, but like all things it took longer than expected. There was a really bad drywall seam under the window which I was trying to smooth out. When I was sanding it I noticed that the trim on the window was a good inch away from the wall (and someone had tried to glob silicone caulk in there to compensate). I pulled off the trim and found that a wooden shim had slipped and was pushing the drywall out. I knocked the shim back in place and that let the drywall move back where it should be, but then I had to re-spackle it and wait for it to dry.
  • Prime and paint master bedroom – Nope. See above.
  • Remove rotten plywood in laundry room –  Nope. After I saw what a horror show the joist was I just stopped.
  • Bonus: Priming another bedroom and the upstairs landing. This wasn’t on the original agenda but Matt and Chris took care of this while I was frowning at the hole in the laundry room.
  • Extra bonus: our contractor fixed the broken shed door because he was tired of dropping it on  his foot.

Huge thanks are also owed to Chris’s mom, who wrangled the toddler while we did all this. Kiddo came through the house a few times like a tiny foreman. “Everyone is working on fixing up my beach house!” she announced.

1970s Shore Home, DIY and Decor

More Backsplash Colors

Following up on yesterday’s backsplash indecision: I found some more ideas I liked and mocked them up in SketchUp. SketchUp continues to be a rather poor way to visualize these things, but it’s all I’ve got so I make do.

I found this tile on Pinterest and fell in love with it:

tealtile
oh hello, beveled glass tile

Once again the sketchup mockups were a bit underwhelming, but I played around with a few different tile / wall options. Never mind the missing lower cabinet, I accidentally deleted it and don’t feel like re-creating it right now.

I think ultimately I need to go lighter on the backsplash, even though I kind of want to cover the entire house in that teal tile.

Maybe something more like this?
bluetile

1970s Shore Home

Ordering Cabinets, Appliances, and Picking Backsplash Colors

On Tuesday I went to Ikea before work to order cabinets. I wanted to go in the morning during the week because I know that with the current sale the place is a total zoo on the weekends. I also was warned that ordering Ikea cabinets is not a fast process, and to allow about an hour. Unfortunately it took more like three.

The downside of getting there early was that I got there before the manager of the kitchen area. There was a sales associate there to help me, but he was new and couldn’t handle some of the more complicated aspects of my order. I didn’t want any doors (we’re getting them made in solid wood by Scherr’s instead), I wanted to order custom quartz countertops, and I needed them to calculate the undercabinet lighting stuff for me. New Guy helped me as best he could but ultimately Mr Manager had to come and redo most of it when he got in.

Aside from the new guy drama, ordering cabinets is just really fiddly and seemingly lacking optimization. First you bring up your design from the 3D planning software. Then they import the design into their sales order software. Then they go through every single cabinet in the order to make sure everything is correct. Along the way they fix any inconsistencies (I had accidentally selected one off-white panel to go with my white panels, for example) and account for any design oversights you may have made. For whatever reason some things like lighting can’t be added in the 3D design software and must be hand-added by staff. The quartz counter tops are handled by a 3rd party vendor, so that’s an entirely separate process. The sales associate has to calculate all the rough dimensions and edgings of your counter top in order to give you a quote. It just all takes a while.

The design as seen in Ikea's tool
The design as seen in Ikea’s tool

There are a few design tweaks since the last revision: we ended up going with a narrower fridge, and I reconfigured some things to the left of the range, so now I don’t have to do any major surgery on the cabinets. I’m still making a custom shelf for the end of the upper cabinets, but no other hacking is needed.

I ordered the fridge and range from a local appliance place. They were the same price or better than Home Depot / Lowes for the same models. The Sears outlet had a really good price on a scratch + dent dishwasher so I’m going to try to get out there this weekend to see it.

Everything is slowly coming together. I started looking at backsplash tile today while I was in Lowes. Two choices that looked really cute in the store look really overwhelming when I mocked them up in SketchUp.

In person I thought "these look great!"
In person I thought “these look great!”

In SketchUp they look kind of like a train wreck and I don’t know if it’s just because the colors aren’t real-to-life accurate, or if it really would look this busy. The green one looks SUPER GREEN in the mockup, which is not what I was going for at all.

Backsplash1
So much texture!
backsplash2
So much green!

Mercifully the backsplash is one of the last steps so I have a while to think about it. But omg, so many steps to this process. We’re going down this weekend to hopefully finish ripping out the soffit, and maaaaaaybe take out the hot water heater and start working on the subfloor repairs. Oh and paint prep. There is always more paint prep to do.

1970s Shore Home

Fear of Commitment (to a kitchen)

First thing’s first: I took my first trip to the dump last weekend! We dumped over 600 pounds of kitchen! It was an adventure, but not a very interesting one so you might have missed the blog post as I didn’t email it out.

It’s nearly time to order the cabinets for the kitchen and I’m having trouble getting everything finalized. We got the latest revision from the designer and I’m nitpicking about a lot of little stuff (and a few medium sized things).

The space between the window and the fridge is kind of awkward and I don’t love the designer’s solution of putting a cabinet there. I think that whole area of their design looks weird:

Not feeling the cabinet to the right of the window
Not feeling the cabinet to the right of the window

I think I’m going to leave that area empty and experiment with little open shelves once it’s all in. Or just leave it open. Or remove the cabinet to the left of the window and put open shelves there to balance things out. Or slowly go insane due to the available options.

The other thing I don’t like about the designer’s design is that there’s 6″ of space between the end of the cabinets and the wall. This is just due to the limits of Ikea cabinet sizes, but I found a YouTube video detailing how to cut cabinets down so I think I might make a little custom cabinet next to the oven for storing baking sheets. Then I’ll make a little open end shelf for the top so everything lines up. I’m also going to build a custom wine rack for over the fridge.

A sketchup diagram of my mods
A sketchup diagram of my mods.

The island is missing from this diagram, partly because I didn’t feel like modeling it in SketchUp, but also because I’m afraid of committing to it. I suggested to Chris that we get a counter height table instead of building cabinets in. He pointed out that we probably would never actually need or want to move it and that I should just stop waffling about everything. I taped it out in the current kitchen and made sure there’s still room to get the washer/dryer back into the laundry room. There’s an exterior door in the laundry room but it would be super annoying to have to take everything out and then back in because the island is in the way.

I think it will be an awesome island?
I think it will be an awesome island?

I have a long while to think about things before we actually install the cabinets, because there are about 800 steps that come first, but they need to be ordered in the next couple of weeks in order to take advantage of the Ikea kitchen sale. 20% off of $4000 of cabinets (oh my god) is huge.

The list of to-dos for the house is kind of overwhelming. I put it all in Trello to try and make sense of it all but it honestly just seems more insane now. Everything in the kitchen is blocked by needing to remove the hot water heater and fix the rotted flooring under it. Family members have volunteered to help make this happen, but with a few family events the next few weekends I’m not sure when we’ll all be down there next. In the meantime I’ll work on painting the bedrooms, and removing the awful parquet flooring that I have discovered is just stick-on vinyl.

trello

The contractors are hard at work, at least. The electrician came down on Tuesday to do the wiring for the kitchen, and the structural guys are working in the crawlspace to get everything shored up and dried out. The gas company came and planted little flags in the yard marking where the gas line is going to go. In 6-8 weeks we should have gas service.

But yeah feeling kind of overwhelmed at the moment.

1970s Shore Home

Another work weekend

We spent the weekend working on the house again, but it didn’t feel nearly as satisfying as last week’s kitchen demo.

The big adventure for the weekend was taking a load of debris to the dump. The local transfer center and garbage collectors won’t take bulky trash like ours, so we drove it to the big dump in town. My dad brought down his trailer (hitched to a Volkswagen Passat) and we completely filled it. When you get to the dump they weigh your car and give you a slip of paper. When you leave they weigh you again and charge you based on how much you dropped off. We had over 600 pounds of debris from the kitchen, and it cost about $30. It was a surprisingly clean dump and didn’t smell too horrible. For a dump.

Not shown: giant bulldozers
Not shown: giant bulldozers

After that we went to 84 Lumber to get luan for the floor. We’re nowhere near ready for it yet, but we had the trailer so I figured we’d make use of it.

The final round of flooring removal in the laundry room was grueling. Thanks to water damage the staples are all rusted and were a huge pain to get up. It took easily 3x longer than the stuff in the kitchen. But it’s all gone except for a few small squares trapped under the hot water heater. Unfortunately the plywood subfloor under the hot water heater is in really rough shape. You can see how the weight of the heater is causing it to compress because it’s rotted. It actually looks better in this picture than it does in real life.

2015-03-29 17.22.23
The wood sags a good 5mm under the heater.

The short wall next to where the fridge used to be came down this weekend too.

Now with 25% fewer walls!
Now with 25% fewer walls!

The other task for the weekend was priming the walls upstairs. We got about 1/3rd of the way done with the walls. The trim is kind of a mess and I’m deciding if I care enough to scrape/sand it or replace it (it’s cheap stuff, less than a dollar per foot). No one will notice either way, but I will. Gross gloppy trim drives me nuts. Because that’s the kind of neurotic I am.

1970s Shore Home, DIY and Decor

Oh Fancy Custom Cabinet Doors

One of the things you can do to class up an Ikea kitchen is to spring for non-Ikea doors. There are a couple companies that do this, most notably SemiHandmade and Scherrs. I’ve had my eye on some beadboard panel doors:

Traditional Kitchen by Newport Beach Kitchen & Bath Designers BK Interiors

As far as default IKEA options go the only one I’m even vaguely into are the white BOBDYN doors.

I mean it's OK
I mean it’s OK

I don’t really have anything against the IKEA doors, except maybe the shade of “off-white” is a little too far “off” for my tastes. But really I’m splitting hairs. I just love the look of the beadboard doors.

Unfortunately the quote for my beloved custom doors came in at literally twice the price of the IKEA doors. Ouch. I understand why: it’s an apples to oranges comparison. BOBDYN is made of MDF (aka particleboard) with a white veneer. Scherrs doors are solid wood. Oh, yeah, that “twice as much” quote doesn’t include painting, I’d have to do that myself (or pay extra). It’s a much smaller jump from Ikea’s solid wood doors to Scherrs. But the price gap between MDF and solid wood is significant. If we go with IKEA we’re looking at $1000 worth of doors. Even with the money we’re saving by DIYing a lot of stuff I’m just not sure I can justify shelling out an extra grand on doors.

It’s not all lost yet; the Sherrs folks are looking to see if we can rework the quote to be a little more budget friendly by swapping out a few things, but at this point I’m not optimistic. At the end of the day I have to think about other things that money could go towards (like a nice stove).

Overall I’ve been dealing with a lot of sticker shock over just how much all this stuff costs. I’ve never redone a kitchen before – both the condo and our current place had nice kitchens when we moved in. This stuff is nuts. Right now we’re looking at spending almost $14k on a 10′ x 10′ kitchen, using mid-grade stuff (except those countertops; I will die for my quartz countertops) and DIYing all we can.

So yeah kitchens are insane.

Update 3/27: it turns out I can’t read. The new quote came in much lower, and then I realized I’d misread the original quote. I did not notice the 25% discount applied, which cut the price of the doors by $500. So the solid-wood doors are still 50% more than the ikea MDF but… maybe it’s worth it?

1970s Shore Home

Demolition Weekend

This weekend seven of us descended upon the shore house to rip out the kitchen and begin prepping the walls for paint.

Take a good look at this picture of the kitchen, because it’s the last you’ll see of it!

IMG_2274

First we removed all the appliances and put them in the living room. I was really glad I had my dad and another handy friend with us, because I had no idea how to remove a dishwasher. Additionally, the shutoff valve for the dishwasher water supply failed, spraying water everywhere. Thankfully there is very easy access to the main water shutoff, and we could use my in-laws’ bathrooms next door.

Appliance Party!
Appliance Party!

Next we took off the doors and started taking the cabinets apart. The sink came out and then we ripped off the countertops.

Some of the cabinets came out in one piece, and those will be donated to Habitat for Humanity’s ReStore along with the dishwasher, stove, sink, and garbage disposal. Other cabinets were not so lucky.

My dad using a sawzall on one of the cabinets
My dad using a sawzall on one of the cabinets

Removing the cabinets revealed that there were not two layers of vinyl flooring, as we’d thought, but actually three.

Top layer on the bottom, middle layer on left, original flooring on the right
Top layer on the bottom, middle layer on left, original flooring on the right

I took samples of the layers of flooring and had them sent to a lab for asbestos testing. Thankfully they came back negative, but it’s still gross dirty work so we wore respirators. The plan was to take up the top two layers and leave the one beneath that. There are only so many surprises I can take in one day.

Between each layer of vinyl was a layer of plywood underlayment. The plywood was held down with approximately 1000 staples. It took four of us at least four hours to get all the goddamned staples out. Each staple was at least an inch long and had to be pried out with vice grips. Regular pliers were completely useless for the task.

311EJFHNP4L
We had one of these on Saturday. We went to the hardware store on Sunday and bought 4 more.

 

After pulling out staples forever we pulled up the middle layer. Because it was glued down (surprise!) the bottom layer started coming up with it. Thankfully the bottom layer came up mostly intact so it wasn’t too terrible. I don’t know what the moral of this story is, because I don’t think it’s “leave your floor covered in 40 years and 2 inches worth of vinyl.” My takeaway is that we should build a time machine and stop everyone from putting a million layers of flooring down.

Thanks to water damage on the floor, the plywood in the laundry room came up without taking much of the asbestos tile with it. The pile of debris in this photo is actually plywood that had decomposed into dirt. On the right side you can see a spot that jettisoned an old tile.

Laundry Room
Laundry Room

The last major items to demolish are the soffit above the cabinets and the wall next to the fridge. And electrician came in and removed the wires that were running through the wall so that we could safely remove it. He’ll be back in a few weeks to button it all up.

Goodbye Wall
Goodbye Wall

With the kitchen emptied out I taped off where the new cabinets are going to go. I wasn’t sure about the island before, but now I think it’ll fit comfortably.

IMG_2372

There is still some work to do but it’s coming along. In addition to the kitchen demo there was also a ton of spackling and sanding happening upstairs. I salvaged some of the drywall from the kitchen wall in order to make a patch which will go in this charming space where someone ran wires and didn’t close it back up. Or paint around it.

I don't even know what's happening here.
I don’t even know what’s happening here.

In the meantime I’ve got a million contractors scheduled. The crawlspace needs work (which we knew about before purchasing) and originally I was going to put it off because it’s not urgent. After spending 5 minutes under there I think we should do it sooner rather than later. It’s very damp all the time due to the fact that the soil has eroded below the bottom of the foundation and water has no way to escape.

Other big-ticket items are the heating system. I want to convert to gas, and then if we convert to gas the question is do we replace the aging hot water heater now. And if we do, do we get a tankless system. The tankless system is wayyyyyyy more expensive but in a house where we’ll regularly have 8+ people sleeping/showering a tankless system is very appealing. Even if we can only run one shower at a time (a complaint I’ve heard with tankless), 8 warm showers is better than 2 warm showers and 6 cold showers.

Right now I’m feeling a liiiiiittle bit overwhelmed by the scope of this project. We can talk about my sticker shock over the price of countertops another day.

Hacking

Pebble Time: Meh

I have been into geeky watches for a very long time. In high school I sported one of these bad boys:

Timex Datalink Watch
Timex Datalink

I have a red Pebble smartwatch and love it. I’ve been following the Apple Watch hubub and laughing, because the 18-hour battery life is a joke and my Pebble gets a week. I figured Pebble would have some sort of response to the Apple Watch, and they did: Pebble Time.

Meh.
Meh.

If we cruise past the fact that it is larger and uglier than the existing Pebble watch (which is enough to stop many people right there), here’s my main problem with the Pebble Time: I really don’t need a color watch face.

I have installed and uninstalled many Pebble apps over the last year. The things I actually want my watch to do include:

  • telling the time
  • seeing the name of a caller so I can decide whether to dig my phone out of my purse
  • seeing text messages without digging my phone out of my purse
  • seeing calls/text messages when I left my phone downstairs
  • tracking my run time/distance
  • using a stopwatch/intervalometer when working out

You’ll notice there’s not a lot on this list. Two of the items are covered by your standard Timex Ironman watch. Among the things I have uninstalled are games, weather, photo galleries, yelp, and other widgets that I ultimately decided just don’t belong on a watch. It’s bad enough to look like a dickhead messing with your phone all the time. Squinting into your wrist and hitting buttons doesn’t look any cooler, I assure you. I use my watch for things I can glance at and make a decision. I don’t generally want to interact with it.

I think the form factor is also a huge deal for a segment of the tech-loving population that has been neglected time and time again by wearable tech: women. I’m not saying this because the watch is “too techy” or “not pink enough” for ladies. I’m saying this because it’s fucking huge and on average women have smaller wrists than men.

My Pebble is no less awkward on my wrist than my Datalink was in 1999 and that thing was a standalone pager (oh, turn of the century tech). The Pebble watchface itself is literally taller than my wrist is wide. It takes a certain commitment to tech and discomfort to be willing to wear one of these things as a small-wristed person.

So here’s hoping Pebble’s next iteration is a watch that will actually fit on my wrist, instead of a bunch of features I don’t need in a watch.